Choosing your bridge
January 4, 2024
Choosing a Footbridge: How to Specify the Right Bison Bridge
Choosing a footbridge means balancing who will use it, how far it needs to span, the ground at each bank and your budget. To make that easier, the Bison Bridges website now has a bridge specifier tool. Select the options that match your project, see the right pricing, and submit your enquiry in a few minutes.
Use the bridge specifier tool
The specifier walks you through the key decisions for your crossing. Once you’ve chosen your options, it shows the relevant pricing so you can budget with confidence, then lets you send your enquiry straight to our team. No guesswork, no back-and-forth to get a first price.
Five things to consider when choosing a footbridge
1. Who will use the bridge?
The intended users decide much of the design. Bison offers:
- Pedestrian bridges – for footpaths, parks, gardens and public rights of way.
- Cycle bridges – including mountain bike and cycle trail bridges.
- Bridleway bridges – with wider deck options and secure surfacing for horses and riders.
If the route needs step-free access, read our guide to wheelchair accessible bridges.
2. How long does the span need to be?
Measure the gap between the two banks, allowing space for the abutments at each end. Bison bridge kits are available up to 16 m, and our most popular sizes from 3 m to 10 m are held in stock for fast UK delivery.
3. Deck and materials
Bison bridges are built on hot dip galvanised bridge beams for long-term corrosion protection, with decking in a range of timbers or recycled plastic. Consider the setting, expected footfall and how much maintenance you want to commit to.
4. Abutments and ground conditions
Every bridge needs a secure support at each bank. The right abutment depends on site access, ground conditions and programme:
- Cast concrete bridge abutments – solid and permanent where concrete deliveries can reach.
- Precast concrete bridge abutments – interlocking blocks with no curing time.
- Gabion bridge abutments – free-draining, natural-looking stone crates.
- Ground screw bridge foundations – a no-dig option for sensitive or hard-to-reach sites.
Your structural engineer should confirm the right foundation for your site.
5. Budget and lead time
Stock sizes are the quickest and most cost-effective route. The specifier tool shows pricing for your selected options up front, so you can compare choices before you enquire.
Need help choosing?
Of course, we’re here to help. If you’d rather talk your project through, our engineers offer specification support – call us on 01530 242 405 or contact us. You can also browse our full Bridges & Boardwalks range, see completed case studies or download technical information from the Specification Hub.
Start Your Project Today
Quick to install, built to last and unbeatable in performance and value. Request a quote for bridges, boardwalks or any outdoor structure.